What was found
DURING AN IMBV INSPECTION THE RIGHT FLOORBEAM WAS FOUND TO BE CORRODED BEYOND SRM LIMITS AT FRAME 23. BLENDED THE DAMAGED AREA TO COMPLETELY REMOVED THE CORROSION. FABRICATED A U SHAPED DOUBLER. REPAIR DONE IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING AN IMBV INSPECTION THE RIGHT FLOORBEAM WAS FOUND TO BE CORRODED BEYOND SRM LIMITS AT FRAME 23. BLENDED THE DAMAGED AREA TO COMPLETELY REMOVED THE CORROSION. FABRICATED A U SHAPED DOUBLER. REPAIR DONE IAW SRM.