As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ABI - DURING AN IMBV INSPECTION, THE CENTER OMEGA BEAM AT FRAME 24 WAS FOUND TO BE CORRODED BELOW SRM LIMITS. CUT OUT A SECTION OF THE CENTER OMEGA BEAM. FABRICATED A FILLER, SHIMS AND EXTERNAL ANGLE. REPAIR DONE IAW EMB 145 SRM (EMB SRM 145.1142 REV 19) CHAPTER 53-22-10 AND EMB 145 GST 3087/02. (M)