As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ABI - DURING AN IMBV INSPECTION, THE LEFT OMEGA BEAM AT FRAME 24 WAS FOUND TO BE CORRODED BEYOND SRM LIMITS. CUT OUT A SECTION OF THE CENTER OMEGA BEAM. FABRICATED A FILLER, SHIMS AND EXTERNAL ANGLE. REPAIR DONE IAW EMB 145 SRM (145/1142 REV 19) CHAPTER 53-21-10 AND EMB 145 GST-3087/02. (M)