As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
ABI - DURING A IMBV INSPECTION, THE OMEGA BEAM BETWEEN FRAMES 23 AND 25 WAS FOUND TO BE CORRODED BELOW SRM LIMITS. CUTOUT 4 INCH SECTION OF DAMAGED OMEGA BEAM. FABRICATED AN EXTERNAL ANGLE, TWO SHIMS. REPAIR DONE IAW EMB SRM (SRM EMB 145/1142 REV 20) CHAPTER 53-21-10 FIG 202. (M)