What was found
ABI - THIS IS A LEVEL TWO FINDING, FOUND DURING AN IMBV INSPECTION GALLEY CENTER BEAM GUSSET CORRODED. REMOVED AND INSALLED NEW CETNER BEAM GUSSET IAW EMB 135 SRM 51-40-02, 51-20-03, 51-40-04, 51-40-06. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ABI - THIS IS A LEVEL TWO FINDING, FOUND DURING AN IMBV INSPECTION GALLEY CENTER BEAM GUSSET CORRODED. REMOVED AND INSALLED NEW CETNER BEAM GUSSET IAW EMB 135 SRM 51-40-02, 51-20-03, 51-40-04, 51-40-06. (M)