What was found
ABI - DURING AN IMBV INSPECTION, FOUND CORROSION ON THE LEFT FLOORBEAM BETWEEN FRAMES 24 AND 25. REMOVED CORROSION BY PERFORMING A 4.5 INCH CUTOUT. FABRICATED A DOUBLER ANGLE, FILLER AND TWO SHIMS. REPAIR DONE IAW EMB 145 SRM 145/1142 REV 20, 53-21-10, AND STANDARD SRM PRACTICES. (M)