What was found
ABI - DURING AN IMBV INSPECTION, THE GALLEY FORWARD FLOORBEAM WAS FOUND TO BE CORRODED BELOW SRM LIMITS. CUT OUT THE DAMAGED SECTION OF THE FORWARD FLOORBEAM. FABRICATED A REPAIR STRAP, SHIM AND TWO DOUBLERS. REPAIR DONE IAW EMB SRM, SRM 145/1142 REV 21 CHAPTERS 53-21-10 FIG 203. (M)