What was found
ABI - DURING AN MBV INSPECTION A DENT WAS FOUND BETWEEN FRAME 75 AND 75A AND STRINGERS 10L, 11L. PERFORMED AN EDDY CURRENT INSPECTION OF THE DENT. NO DEFECTS NOTED. REMOVED DAMAGED AREA BY CREATING A 2 INCH BY 3 INCH CUTOUT. PERFORMED ADDITIONAL NDT INSPECTION WITH NO DEFECTS NOTED. FABRICATED A DOUBLER, TRIPLER AND FILLER. REPAIR DONE IAW EMB REPAIR STATEMENT IC2003-145/1358, IC2003-145/1393 AND STANDARD EMB SRM, SRM 145/1142 REV 21 PRACTICES. (M)