What was found
DURING AN IMBV INSPECTION, THE LEFT SECTION OF THE FORWARD FLOORBEAM WAS FOUND TO BE CORRODED BEYOND SRM LIMITS. REMOVED DAMAGED 6 INCHES BY 3.5 INCHES SECTION OF THE LEFT SECTION OF THE FORWARD FLOORBEAM BY CUTOUT. FABRICATED A REPLACEMENT FORWARD FLOORBEAM CENTER SECTION AND FABRICATED ONE DOUBLER. REPAIR DONE IAW EMB 145 REPAIR STATEMENT IC2003-145/1380 PARA 1 PRINCIPLES OF EMB 145/1142 CHAPTERS 53, REV 21, 53-21-10 PARA 4 AND STANDARD SRM PRACTICES. (M)