What was found
ABI - DURING AN IMBV INSPECTION, THE PASSENGER DOOR LOWER SEALING SUPPORT FOUND TO BE CORRODED BEYOND SRM LIMITS. REMOVED THE LOWER SEALING SUPPORT AND ATTACHED STRUCTURE. FABRICATED A REPLACEMENT SUPPORT. FABRICATION AUTHORITY CONTAINED IN EMB STATEMENT IC2003-145/1435. REPAIR DONE IAW EMB STATEMENT IC2003-145/1435, EMB SRM, SRM 145/1142 REV 21, 51-20-03, 51-40-02, 51-40-06, EMB CPM, CPM 145/1132 REV 8, 51-21-04, 51-21-05, 51-21-06, AND STANDARD SRM PRACTICES. (M)