What was found
ABI - DURING AN IMBV INSPECTION, CORROSION FOUND ON THE LEFT OMEGA BEAM AT FRAME 20. COMPLETELY REMOVED CORROSION BY CREATIN A CUTOUT. FABRICATED AN EXTERNAL ANGLE, FILLER AND A PLATE. REPAIR DONE IAW EMB 145 SRM, 145-1142 REV 22, 53-21-10 PARA 2 FIG 201 SHEET 1, AND STANDARD SRM PRACTICES. (M)