What was found
ABI - DURING AN MBV INSPECTION, THE CENTER OMEGA BEAM BETWEEN FRAMES 24 AND 25 WAS FOUND CORRODED BELOW SRM LIMITS. CUT OUT SECTION OF DAMAGED OMEGA BEAM. FABRICATED A REPAIR ANGLE, FILLER, SHIMS, REPAIR DONE IAW EMB 145 SRM, SRM EMB 145/1142 REV 22, CHAPTER 53-22-10 FIGURE 201. (M)