What was found
DURING AN IMBV INSPECTION, THE CENTER FLOORBEAM BETWEEN FRAMES 24 AND 25 WAS FOUND CORRODED BELOW SRM LIMITS. PERFORMED A CUT OUT OF THE DAMAGED ARAE. FABRICATED A REPAIR DOUBLER, FILLER AND TWO SHIMS FOR REPAIR. REPAIR DONE IAW EMB 145 SRM, SRM EMB 145/1142 REV 22, CHAPTER 53-22-10, 51-40-02, 51-40-04 AND 51-40-06. (M)