What was found
ABI - DURING AN IMBV INSPECTION, A CRACK WAS DISCOVERED ON THE LEFT FUSELAGE SKIN BETWEEN FRAMES 48 AND 49 AT THE OVERWING PANEL AFT UPPER ATTACH POIT. PERFORMED CUT OUT OF THE DAMAGE AREA. FABRICATED A FILLER, REPAIR DOUBELR. REPAIR DONE IAW EMB 145 SRM, SRM EMB-145/1142 REV 22, CHAPTERS 53-23-12, 51-40-04 AND 51-40-06. (M)