What was found
ABI - DURING A MBV INSPECTION, THE LEFT OMEGA BEAM BETWEEN FRAMES 24 AND 25 WAS FOUND TO BE CORRODED BELOW SRM LIMTIS. CUT OUT DAMAGE SECTION OF BEAM, CLEANED AND TREATED THE REPAIR AREA. FABRICATED AN EXTERNAL ANGLE, FILLER AND TWO SHIMS. REPAIR DONE IAW EMB SRM, SRM EMB 145/1142, REV 22, CHAPTER 53-21-10 FIG 201 AND CPM 51-61-00. (M)