What was found
DURING AN IMBV INSPECTION, THE CENTER SECTION OF THE FORWARD DIGITAL WAS FOUND TO BE CORRODED BEYOND SRM LIMITS. REMOVED DAMAGED SECTION OF THE FORWARD DIGITAL BY CUTOUT. FABRICATED A REPLACEMENT FORWARD DIGITAL CENTER SECTION, FABRICATED TWO DOUBLERS, SHIMS. REPAIR DONE IAW EMB SRM, SRM 145/1142, REV 23, 53-21-10 PARA 4, AND STANDARD SRM PRACTICES. (M)