What was found
ABI - DURING AN MBV INSPECTION OF THE TOP FLANGE OF THE LOWER PORTION OF FRAME 258.0 IT WAS FOUND THAT THE PREVIOUS REPAIR WAS CORRODED BEYOND SRM LIMITS. REMOVED DAMAGED PREVIOUS REPAIR. INCREASED THE EXISTING CUT OUT TO ENCOMPASS HOLES WITH QUESTIONABLE EDGE DISTANCE. PERFORMED AN EDDY CURRENT INSPECTION WITH NO DEFECTS NOTED. FABRICATED AN 'L' SHAPED FILLER, REPAIR ANGLE, AND TWO TRIPLERS. REPAIR DONE IAW SAAB REPAIR STATEMENT 340SDS006771 AND STANDARD SRM PRACTICES. (M)