What was found
ABI - DUIRNG AN MBV INSPECTION, GALLEY AREA FRAME AT FS 231 FOUND TO BE CORRODED BEYOND SRM LIMITS. PERFORMED A CUT OUT OF THE CORRODED AREA. FABRICATED A FILLER, DOUBLER AND SHIMS. REPAIR DONE IAW SAAB 340 SRM, SRM 72LKS 3079, REV 43, CHAPTER 53-70-30 FIGURE 207. (M)