What was found
DURING AN IMBV INSPECTION THE GALLEY CENTER BEAM WAS FOUND CORRODED. CUTOUT A SECTION OF THE DAMGAED AREA. FABRICATED A U SHAPE DOUBLER. REPAIR DONE IAW EMB 145 SRM, SRM 145/1142 REV 27, CHAPTER 53-21-10 PARA 5 FIG 204 SHEET 2. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING AN IMBV INSPECTION THE GALLEY CENTER BEAM WAS FOUND CORRODED. CUTOUT A SECTION OF THE DAMGAED AREA. FABRICATED A U SHAPE DOUBLER. REPAIR DONE IAW EMB 145 SRM, SRM 145/1142 REV 27, CHAPTER 53-21-10 PARA 5 FIG 204 SHEET 2. (M)