What was found
DURING AN IMBV INSPECTION THE CENTER OMEGA BEAM WAS FOUND TO BE CORRODED AT FRAME 25. REMOVED CORROSION BY MAKING CUTOUT. FABRICATED A FILLER, 2 SHIMS AND EXTERNAL ANGLE. REPAIR DONE IAW SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING AN IMBV INSPECTION THE CENTER OMEGA BEAM WAS FOUND TO BE CORRODED AT FRAME 25. REMOVED CORROSION BY MAKING CUTOUT. FABRICATED A FILLER, 2 SHIMS AND EXTERNAL ANGLE. REPAIR DONE IAW SRM.