What was found
DURING MBV INSPECTION THE CENTER OMEGA BEAM BETWEEN FRAMES 23 AND 25 WAS FOUND TO BE CORRODED. PERFORMED A CUTOUT OF DAMAGED AREA. FABRICATED EXTERNAL ANGLE, SHIMS AND FILLER. REPAIR DONE IAW SRM. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING MBV INSPECTION THE CENTER OMEGA BEAM BETWEEN FRAMES 23 AND 25 WAS FOUND TO BE CORRODED. PERFORMED A CUTOUT OF DAMAGED AREA. FABRICATED EXTERNAL ANGLE, SHIMS AND FILLER. REPAIR DONE IAW SRM. (K)