What was found
DURING AN INSPECTION MAINTENANCE FOUND THE CENTER OMEGA BEAM WAS FOUND TO BE CORRODED AT FRAME 25. REMOVED THE CORROSION BY MAKING A CUT OUT. FABRICATED A DOUBLER, FILLER AND TWO SHIMS. REPAIR DONE ISW SRM. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING AN INSPECTION MAINTENANCE FOUND THE CENTER OMEGA BEAM WAS FOUND TO BE CORRODED AT FRAME 25. REMOVED THE CORROSION BY MAKING A CUT OUT. FABRICATED A DOUBLER, FILLER AND TWO SHIMS. REPAIR DONE ISW SRM. (K)