What was found
DURING AN IMBV INSPECTION, THE LEFT OMEGA BEAM AT FRAME 25 WAS FOUND CORRODED. PERFORMED A CUTOUT TO REMOVE THE CORROSION. FABRICATED AN EXTERNAL ANGLE, FILLER AND TWO SHIMS. REPAIR DONE IAW EMB 145 SRM, SRM EMB-145/1142 REV 28 CHAPTERS 53-21-10 FIG 201. (M)