What was found
ABI - DURING AN IMBV INSPECTION, THE CENTER OMEGA BEAM BETWEEN FRAMES 26 AND 27 WAS FOUND CORRODED. PERFORMED A CUTOUT OF THE CENTER OMEGA TO REMOVE CORROSION. FABRICATED A EXTERNAL ANGLE, FILLER AND TWO SHIMS. REPAIR DONE IAW EMB REPAIR STATEMENT IC2005-145/2723 PARA 1 DATED MAY 25, 2005. (M)