What was found
THE CENTER OMEGA BEAM AT FRAME 25 WAS FOUND CORRODED. PERFORMED A CUT OUT OF THE CENTER OMEGA BEAM TO REMOVE CORROSION FABRICATED A FILLER DOUBLER AND 2 SHIMS. REPAIR DONE IAW SRM. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
THE CENTER OMEGA BEAM AT FRAME 25 WAS FOUND CORRODED. PERFORMED A CUT OUT OF THE CENTER OMEGA BEAM TO REMOVE CORROSION FABRICATED A FILLER DOUBLER AND 2 SHIMS. REPAIR DONE IAW SRM. (K)