What was found
DURING INSPECTION OF FUSELAGE CENTER BEAM AT FRAME 25 WAS FOUND TO BE CORRODED. PERFORMED A CUT OUT OF CORRODED AREA. FABRICATED A DOUBLER, FILLER AND 2 SHIM. REPAIR DONE IAW SRM. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING INSPECTION OF FUSELAGE CENTER BEAM AT FRAME 25 WAS FOUND TO BE CORRODED. PERFORMED A CUT OUT OF CORRODED AREA. FABRICATED A DOUBLER, FILLER AND 2 SHIM. REPAIR DONE IAW SRM. (K)