What was found
DURING MBV FOUND THE LT OMEGA BEAM AT FRAME 20 WAS CORRODED. PERFORMED CUTOUT OF THE OMEGA BEAM TO REMOVE CORROSION. PREPARED DOUBLER, FILLER, 2 SHIMS AND PLATE. REPAIR DONE IAW SRM. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING MBV FOUND THE LT OMEGA BEAM AT FRAME 20 WAS CORRODED. PERFORMED CUTOUT OF THE OMEGA BEAM TO REMOVE CORROSION. PREPARED DOUBLER, FILLER, 2 SHIMS AND PLATE. REPAIR DONE IAW SRM. (K)