What was found
DURING A MBV INSPECTION, THE CENTER BEAM AT FRAME 20 WAS FOUND TO BE CORRODED. REMOVED OLD DOUBLER AND REPLACED WITH A NEW DOUBLER IAW EMB 145 SRM 53-21-10 STEPS 1-6. AIRCRAFT RETURNED TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING A MBV INSPECTION, THE CENTER BEAM AT FRAME 20 WAS FOUND TO BE CORRODED. REMOVED OLD DOUBLER AND REPLACED WITH A NEW DOUBLER IAW EMB 145 SRM 53-21-10 STEPS 1-6. AIRCRAFT RETURNED TO SERVICE.