What was found
DURING MBV INSPECTION THE LT OMEGA BEAM AT FRAME 25 WAS FOUND CORRODED. DAMAGE WAS CUT OUT. FABRICATED A REPAIR DOUBLE (AL2024T3.050), FILLER (AL2024T3.050) AND 2 SHIMS (AL2024T3.040). DRILLED, CLEANED, ALODINED, PRIMED AND INSTALLED REPAIR PARTS IAW EMB SRM 51-00-10. ACFT RETURNED TO SERVICE.