What was found
DURING MBV INSPECTION THE CENTER BEAM AT FRAME 25 WAS FOUND CORRODED. DAMAGE WAS CUT OUT. FABRICATED A REPAIR DOUBLE AL2024T3 .071 FILLER AND 2 SHIMS. DRILLED, CLEANED, ALODINED, PRIMED AND INSTALLED REPAIR PARTS IAW EMB SRM 51-00-10. ACFT RETURNED TO SERVICE.