As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING A IMBV INSPECTION, THE CENTER FLOOR OMEGA BEAM AT FRAME 20 WAS FOUND CORRODED. PERFORMED A CUT OUT OF THE CENTER OMEGA BEAM TO REMOVE THE DAMAGE. FABRICATED A REPAIR DOUBLER. CLEANED AND TREATED THE DOUBLER. INSTALLED DOUBLER IAW EMB 145 SRM (SRM EMB-145/1142 REV 40) CHAPTER 53-21-10 FIGURE 202. AIRCRAFT RETURN TO SERVICE.