Service difficulty report · Line · Emb EMB145

Difficulty date
February 21, 2009
Submitted
February 25, 2009
Operation
Air carrier
Aircraft
N610AE
Make and model
Emb EMB145
Aircraft serial
145073
Aircraft time
23,403 hours, 55,979 cycles
Part
Line
Condition
Leaking
Location
Hyd System
Stage of operation
CL
How discovered
O
Nature of condition
K, J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

ON FLIGHT 3385 - CREW REPORTED DURING CLIMB HYDRAULIC SYSTEM 1 QUANTITY WAS IN NORMAL RANGE PRIOR TO DEPARTURE. 15-20 MINUTES INTO FLIGHT SYS 1 BEGAN TO DECREASE FAIRLY RAPIDLY. CREW REPORTED THEY COULD WATCH DECREASE OCCUR. QUANTITY INCREASED SLIGHTLY ON GEAR EXTENSION. QUANTITY NEVER REACHED AMBER RANGE BUT CAME CLOSE WAS DECREASING AT SUCH A RATE THAT SUFFICIENT QUANTITY AT STATION OBB WAS QUESTIONABLE. AIRCRAFT REMOVED FROM SERVICE. REPAIRED LINE IN HYDRAULIC SYSTEM NR 1 UNDER FLOOR AT SEAT 8 IAW JIC 20-10-03-300-801A. OPERATIONAL AND LEAK CHECK GOOD. AIRCRAFT RETURNED TO SERVICE.

More about the Emb EMB-145