What was found
DURING MX INSPECTION, FOUND THE NR 1 & NR 2 BATTERY INOPERABLE. THE ACFT WAS REMOVED FROM SERVICE. R & R THE NR 1 BATTERY AND THE NR 2 BATTERY AND NR 2 BATTERY CHARGER. THE OPS CHECK WAS GOOD. THE ACFT WAS RETURNED TO SERVICE.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING MX INSPECTION, FOUND THE NR 1 & NR 2 BATTERY INOPERABLE. THE ACFT WAS REMOVED FROM SERVICE. R & R THE NR 1 BATTERY AND THE NR 2 BATTERY AND NR 2 BATTERY CHARGER. THE OPS CHECK WAS GOOD. THE ACFT WAS RETURNED TO SERVICE.