What was found
IN CRUISE ELEVATOR SPLIT ON EICAS. PERFORMED OPERATIONS CHECK OF ELEVATOR SPLIT IAW CTJ 700 FIM 27-31-00, OPERATIONS CHECKED NORMAL. R & R DCU NR 1 IAW CRJ 700 MM 31-41-05, GND OPERATIONS CHECKED NORMAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
IN CRUISE ELEVATOR SPLIT ON EICAS. PERFORMED OPERATIONS CHECK OF ELEVATOR SPLIT IAW CTJ 700 FIM 27-31-00, OPERATIONS CHECKED NORMAL. R & R DCU NR 1 IAW CRJ 700 MM 31-41-05, GND OPERATIONS CHECKED NORMAL.