Service difficulty report · Tube · Emb EMB145LR

Difficulty date
July 17, 2014
Submitted
July 21, 2014
Operation
Air carrier
Aircraft
N604AE
Make and model
Emb EMB145LR
Aircraft serial
145058
Aircraft time
39,422 hours, 32,753 cycles
Part
Tube
Condition
Leaking
Location
Ac Bay
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
B

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER TAKEOFF DURING CLIMB OUT AT ABOUT 5000 FT A BLD 2 LEAK MSG WAS PRESENT ON EICAS WITH NO BLD LEAK LIGHT ON THE BLD 2 PB. WHILE COMPLYING WITH AOM 1 PROCEDURE A BLD 1 LEAK MSG WAS PRESENT ON EICAS WITH NO BLD LEAK LT ON THE BLD 1 PB, CONTINUED WITH BOTH BLDS OFF & BOTH PACKS OFF, AFTER ABOUT 5 MIN BLD 2 LEAK MSG DISAPPEARED & BLD 1 LEAK MSG AWAY & CAME BACK ON ABOUT 5 MIN. PERFORMED BLD DUCTS INSPECTION CHECK & FOUND PACK 1 DUAL VLV TUBE ASSY LEAKING. R & R IAW AMM 21-51-14. FOUND BROKEN WIRE ON THERMAL SENSOR WIRE IAW SWPM 20-21-00. PERFORMED OPS & LEAK CHECK WITH APU BLD BOTH PACKS RUNNING FOR ABOUT 30 MIN. ALSO WITH ENG & PACKS RUNNING AT HIGH POWER FOR 5 MIN & NO LEAKS OR MSG AT THIS TIME IAW AMM 72-00-00 36-00-00.

More about the Emb EMB-145LR