What was found
ON CLIMB OUT IN CLB POWER RECEIVED AN ENG 2 BLEED LEAK WARNING, WOULD NOT EXTINGUISH. AFTER FOLLOWING ASSOCIATED CHECKLIST ENG 2 WAS SHUTDOWN IN FLIGHT IAW THE AOM 1 CHECKLIST. BLEED LEAK WARNING REMAINED ON EVEN AFTER THE ENG WAS SHUTDOWN. R & R O RINGS AT JOINTS 18 & 20 IAW AMM CH 36-11-10. GND RAN ENGS AT TO POWER FOR 30 MINUTES, BLEEDS ON PACKS ON, NO LEAKS NOTED. OPERATIONS CHECKED GOOD.