Service difficulty report · Reinforcement · Emb EMB145LR

Difficulty date
March 1, 2016
Submitted
March 1, 2016
Operation
Air carrier
Aircraft
N638AE
Make and model
Emb EMB145LR
Aircraft serial
145172
Aircraft time
39,076 hours, 35,465 cycles
Part
Reinforcement
Condition
Cracked
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

REINFORCEMENT FRAME ABOVE LT WINDSHIELD LATERAL POST CRACKED, PERMANENT REPAIR. R & R REINFORCEMENT ABOVE LATERAL POST IAW ERS-EM-53MR-203.

More about the Emb EMB-145LR