What was found
DURING CLIMB AT 1700 FT, PERFORMED ICE TEST AND PRESSURE CLIMBED AT A RATE OF 2000 FPM, CANCELLED THE ICE TEST AND RETURNED TO NORMAL. PERFORMED QRH PROCEDURES. REMOVED AND REPLACED THE RELAY K0412 IAW AMM 20-13-02, AND WM 21-30-50. PERFORMED AND OPS CHECK OF THE PRESSURIZATION CONTROL SYSTEM IAW AMM 21-31-00. OPS CHECKED GOOD.