What was found
RIGHT OMEGA BEAM HAS A CRACK AT THE NUTPLATE HOLE AT FRAME 61. CUT OUT DAMAGE IAW SRM 53-24-10. PERFORMED HFEC INSPECTION ALONG AREA OF DAMAGE REMOVAL IAW NDTM 51-00-00-916-801-A00, NO DEFECTS NOTED. FABRICATED A REPAIR DOUBLER IAW SRM 53-24-01 AND 51-30-01. PERFORMED FPI OF REPAIR DOUBLER , NO DEFECTS NOTED IAW NDTM INTRODUCTION SECTION D. LOCATED , DRILLED, ALODINED, AND PRIMED THE DOUBLER IAW SRM 51-20-03, CPM 51-21-04, AND 51-21-05. INSTALLED THE DOUBLER IAW SRM 51-20-01, 51-40-02, CPM 51-21-05, AND 51-21-06