Service difficulty report · Pneumatic System · Emb EMB145LR

Difficulty date
May 1, 2018
Submitted
May 15, 2018
Operation
Air carrier
Aircraft
N657AE
Make and model
Emb EMB145LR
Aircraft serial
145744
Aircraft time
36,268 hours, 30,823 cycles
Part
Pneumatic System
Condition
Leaking
Stage of operation
NR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

BLEED 1 LEAK DURING DEPARTURE, RAN QRH, MESSAGE DID NOT EXTINGUISH AND RETURNED TO DEPARTURE. EMERGENCY DECLARED. PERFORMED OPC OF E1 BLEED AIR SYSTEM AS PER EMB145 AMM 36-00-00. OPS CHECKED GOOD. PERFORMED LEAKAGE TEST OF LT AIR BLEED SYSTEM DUCTS IAW AMM 36-00-00. LEAK CHECKED GOOD. PERFORMED AN OPS CHECK IAW AMM 36-11-05, OPS CHECKED GOOD. PERFORMED OPS CHECK OF BLEED 1 TEMP SENSOR IAW AMM 36-11-05, OPS CHECKED GOOD. INSTALLED BLEED DUCT AT JOINT 17 IAW AMM 36-11-10. REPLACED BLEED DUCT CLAMP ON ENGINE 1 BLEED VALVE IAW AMM 36-11-05. REPOSITIONED CLAMPS AND DUCTS BETWEEN PRECOOLER AND Y-DUCT IN THE LT PYLON IAW AMM 36-11-09. OPS AND LEAK CHECKED GOOD. REMOVED AND REPLACED LT PYLON HARNESS W421 IAW SWPM 20-50-00 AND SWPM 20-13-02, OPS CHECKED GOOD IAW AMM 36-20-02. REMOVED AND REPLACED CHECK VALVE GASKET AND OPS CHECKED GOOD IAW AMM 36-11-01.