What was found
FLAP FAIL ON FINAL-C/A-RAI LH FSA #1,#2 ,#3 IAW EMB 145 AMM 27-51-09 AND AMM 27-51-10 OPS TEST GOOD. REMOVED AND REPLACED LH FVS AIRFRAME CONNECTOR J1111 IAW EMB 145 SWPM 20-50-01. RECHECKED WIRING OF LH FVS FOR INSULATION AND CONTINUITY IAW 20-20-03. NO DEFECT NOTED. FLAP SYSTEM OPS CHECK GOOD IAW EMB 145 AMM 27-51-00 AT THIS TIME. RESISTANCE AND INSULATION CHECKS OF LH FTB AND CIRCUIT TEST GOOD. CURRENT DRAW ALSO FOUND TO BE 1.10 A ON BOTH CHANNELS. NO DEFECTS NOTED IAW EMB 145 SWPM 20-20-03.