What was found
BLD 1 OVERHEAT WX MSG CAME ON WHILE CUMBING THROUGH 210 IN CLEAR AIR . QRH PROCEDURE FOLLOLWED TEMP STILL STAYED HIGH IN THE RED EVEN WITH PWR PULLED BACK ON NO 1 ENGINE TEMP CAME DOWN AFTER DECENT INITATED AND NO 2 ENGINE THRUST CAME DOWN TOO. TRANSFERRED TO NRWC 803-DFW-02244-. PACK #2 HAS BLOWN DUCT. AFTER 5 MINUTES OPERATING WITH APU, LOUD RUSH OF AIR HEARD FROM R/H PACK ACM.C/A- REMOVED AND REPLACED RH ENG HIGH STAGE PRESSURE SWTCH IAW AMM 36-11-07. OPC IS GOOD. PERFORMED AIR BLEED OPC IAW AMM 36-00-00-700-803. OPC IS GOOD. RESECURED RH ACM BLEED DUCT TUBE ASSY IAW EMB 140 AMM 21-51-03 OPS CHECK GOOD NO LEAKS NOTED