Service difficulty report · Shutoff Valve · Emb ERJ170200LR

Difficulty date
February 23, 2019
Submitted
February 26, 2019
Operation
Air carrier
Aircraft
N226NN
Make and model
Emb ERJ170200LR
Aircraft serial
17000540
Aircraft time
7,597 hours, 5,209 cycles
Part
Shutoff Valve
Condition
Failed
Stage of operation
NR
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

BLEED 2 LEAK ILLUMINATED IN FLIGHT. RAN QRH RETURNED TO DEPARTURE. BLEED 1 FAIL ILLUMINATED IN FLIGHT RAN QRH EICAS MSG WENT AWAY BUT YELLOW X ON SYSTEMS PAGE OVER BLEED 1 VALVE. BLEED 1 FAIL ILLUMINATED AGAIN AFTER LANDING "TRANSFERRED TO NRWC 026-DFW-01018" -C/A- REMOVED AND REPLACED RH ENG. PRECOOLER OUTLET DUCT GASKET IAW 36-11-08, AND PERFORMED OP CK OF THE RH ENGINE PNEUMATIC BLEED SYSTEM IAW E-175 AMM 36-11-00. OP CHECK GOOD. REMOVED AND REPLACED NACELLE PRESSURE-REGULATING SHUTOFF-VALVE FILTER IAW E175 AMM 36-11-03. PERFORMED OPS CHK OF AIR BLEED SYSTEM IAW E175 AMM 36-00-00-710-801-A. NO BLEED FAULTS MSG NOTICED ON EICAS. OPS CHK GOOD. PERFORMED TAKEOFF/GO-AROUND (TOGA) SWITCH OPERATIONAL TEST IAW E175 AMM TASK 22-11-00-710-801-A, EFFECTIVITY PRIMUS EPIC LOAD 25.7

More about the Emb ERJ 170-200 LR