Service difficulty report · Cabin Pressure · Emb EMB145LR

Difficulty date
February 24, 2019
Submitted
February 27, 2019
Operation
Air carrier
Aircraft
N612AE
Make and model
Emb EMB145LR
Aircraft serial
145079
Aircraft time
45,173 hours, 40,788 cycles
Part
Cabin Pressure
Condition
Malfunctioned
Stage of operation
NR
How discovered
O
Nature of condition
O
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FL 360 CABIN ALTITUDE WAS UNCONTROLLABLE IN AUTO OR MANUAL MODE FOLLOWED QRH PROCEDURES. PERFORM FIM TASK 21-31-00-810-808-A TO STEP 8 NO DEFECT NOTED, NO MORE TIME TO T/S MEL REMAINS OPEN. (M) PROCEDURES C/W. T/S CABIN PRESSURIZATION CONTROL SYSTEM IAW FIM TASK 21-31-00-810-808 STEP 8 PREFORMED AMM TASK 21-31-00-700-808 FOUND TO BE TRASITORY CONDITION OF THE CABIN PRESSURIZATION CONTROL SYSTEM OPS CHECK GOOD NO DEFECTS NOTED REACTIVATED SYSTEM IAW AMM 21-31-03-440-801 AND AMM 21-31-04-440-801 MEL RESTORED

More about the Emb EMB-145LR