Service difficulty report · Structure · Emb EMB135KL

Difficulty date
April 1, 2020
Submitted
April 17, 2020
Operation
Air carrier
Aircraft
N857AE
Make and model
Emb EMB135KL
Aircraft serial
145752
Aircraft time
31,937 hours, 28,723 cycles
Part
Structure
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CORROSION ON FR 80 APU SHUNT AREA-C/A-CORROSION BLENDED OUT OF LIMIT ON FR 80 APU SHUNT AREA. ON FR 80 APU SHUNT AREA REPAIR PARTS ARE FABRICATED AS PER SRM 53-32-04 FIG 203. ON FR 80 APU SHUNT AREA, FR 80 REPAIR PART INSTALLED WITH SOLID RIVET IAW SRM 53-32-04. BONDING TEST OF BRACKET REINFORCEMENT FR 80 APU SHUNT AREA.DONE IAW AMM 2-13-21. FOUND SERVICEABLE. SEE ATTACHED NDT REPORT. APU SHUNT REMOVAL/INSTALLATION COVER ON TASK 35.

More about the Emb EMB-135KL