What was found
SPS-1 FAIL IN CLIMB 17,000-FL190 RAN QRH PROCEDURE, SPS 1-2 INOPERABLE MESSAGE. MECH SPS 1 FAILURE EMERGENCY DECLARED. CONTINUED TO ORD. C/A: R & R NR 1 AOA SENSOR, IAW EMB 145 AMM TASK 27-36-01. OPERATIONS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SPS-1 FAIL IN CLIMB 17,000-FL190 RAN QRH PROCEDURE, SPS 1-2 INOPERABLE MESSAGE. MECH SPS 1 FAILURE EMERGENCY DECLARED. CONTINUED TO ORD. C/A: R & R NR 1 AOA SENSOR, IAW EMB 145 AMM TASK 27-36-01. OPERATIONS CHECK GOOD.