What was found
SSI 53-23-005 FR91 CROSSBEAM SPLICE AT LH LAVATORY TANK SUPPORT BEAM IS CORRODED (LEVEL 2 CORROSION)-C/A-REMOVED, FABRICATED AND INSTALLED FR91 CROSSBEAM SPLICE AT LH LAVATORY TANK SUPPORT BEAM IAW EMB 170 SRM 51-40-08
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SSI 53-23-005 FR91 CROSSBEAM SPLICE AT LH LAVATORY TANK SUPPORT BEAM IS CORRODED (LEVEL 2 CORROSION)-C/A-REMOVED, FABRICATED AND INSTALLED FR91 CROSSBEAM SPLICE AT LH LAVATORY TANK SUPPORT BEAM IAW EMB 170 SRM 51-40-08