SSI 53-23-21-002. GOUGED OUT (MATERIAL LOSS) AT AFT PASSENGER-DOOR (L2) COMMAND-RAMP ON THE FUSELAGE (AFT SIDE). REMOVED GOUGE FROM AFT PASSENGER-DOOR AFT COMMAND-RAMP (INFERIOR FLANGE) PER EMB-175 SRM 51-10-03. BLENDED AREA MEASURES H=0.059? W=0.086?. ORIGINAL THICKNESS IS 0.157? PER EMB-175 SRM 53-00-30/AD01. BLENDED AREA IS FOUND TO BE OUT OF ALLOWABLE LIMITS PER EMB-175 SRM 53-00-30/AD01, FIGURE 101 (SHEET 3). REMOVED AND REPLACED AFT PASSENGER-DOOR (L2) COMMAND-RAMP PN 170-83864-007, ON THE FUSELAGE AFT SIDE REF EMB 175 AMM 53-23-21. OPS CHECK AND DOOR ADJUSTMENT GOOD REF EMB 175 AMM 52-12-00.