What was found
LEVEL 2 CORROSION RH BEAM HAS CORROSION AT FR 87 Y + 13. (LVL 2 CORROSION) (MAJOR REPAIR) RT BEAM HAS CORROSION AT FR 87 Y + 13 BLENDED CORROSION ON RH BEAM AT FR 87 Y+ 13" IAW E-175 SRM 51-10-03. MATERIAL REMOVED .070" MATERIAL REMAINING .0" OUT OF ALLOWABLE LIMITS IAW E-175 SRM 51-75-16. PN 170-65669-004 LOCATED, DRILLED, DEBURED, TREATED AND PRIMED NEW RH BEAM IAW E-175 SRM 51-40-02 SRM 51-23-04 SRM 51-23-05 AND ETN-EJ-51-025. RESTORED FINISH IAW SRM 51-23-06, ETN-EJ-51-015. APPLIED CIC IAW CPM 51-25-00. REMOVED AND REPLACED RT BEAM AT FR 87 Y+13" IAW E-175 SRM 51-40-08. LEVEL 2 CORROSION