What was found
DFW - DURING PHASE 3 INSPECTION OF POWER SUPPLY 30WL, OPERATION WAS INTERMITTENT. RAI'D POWER SUPPLY UNIT. OPS CHECK GOOD. AIRCRAFT WAS RETURNED TO SERVICE. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DFW - DURING PHASE 3 INSPECTION OF POWER SUPPLY 30WL, OPERATION WAS INTERMITTENT. RAI'D POWER SUPPLY UNIT. OPS CHECK GOOD. AIRCRAFT WAS RETURNED TO SERVICE. (M)